Skip to main content
LetCompliance
Running Your Let

The Repairing Standard in Scotland: what it covers, the damp and mould timescales and the Tribunal

Every private let in Scotland must meet the Repairing Standard at the start of the tenancy and throughout it. What the standard lists, the damp and mould timescales in force since 6 October 2026, what a Tribunal order and a rent relief order cost, and the repair log that answers both.

14 min read

Sample account, the Tenant inbox: 1 repair open, with Tell the tenant and Log a repair, then 1 open repair, 0 past the deadline, 1 with no priority set and 1 resolved this month, over the Messages, Repairs, Pet requests, Notices and Meter readings tabs
Sample account, the landlord’s repairs list: Kitchen tap dripping, resolved, reported 16 Oct 2026 and closed 16 Oct 2026
Sample account with made-up details, 16 and 18 Oct 2026

See how LetCompliance tracks repairs

A repair left too long in Scotland costs more than the repair. The Tribunal can order the work, cut the rent by up to 90% if the order is ignored, and fine you up to £1,000 for ignoring it. While the order stands you cannot let the home to anyone new without the Tribunal's consent, and the order is something the council can weigh when you next renew your landlord registration. Since 6 October 2026, damp and mould also run on a clock counted in working days.

This guide sets out what the Repairing Standard requires, when it applies, the damp and mould timescales, what happens at the Tribunal, and the record that shows you kept to it. The law was read on legislation.gov.uk, gov.scot, mygov.scot and the Tribunal's own site on 20 November 2026.

What the standard requires

The Housing (Scotland) Act 2006 sets out the standard in s.13. As in force on 20 November 2026, a let home meets it if:

s.13(1)The requirement
(a)It is wind and water tight and in all other respects reasonably fit for human habitation
(b)The structure and exterior, including drains, gutters and external pipes, are in a reasonable state of repair and in proper working order
(c)The installations for water, gas, electricity (including residual current devices), any other fuel, sanitation, space heating by a fixed heating system and heating water are in a reasonable state of repair and in proper working order
(d)Fixtures, fittings and appliances you provide are in a reasonable state of repair and in proper working order
(e)Furnishings you provide can be used safely for their purpose
(h)It meets the tolerable standard
(ha)It is substantially free from damp and mould (added from 6 October 2026)
(i)Any common parts can be safely accessed and used
(j)It has satisfactory provision for, and safe access to, a food storage area and a food preparation space
(k)In a tenement, the common doors are secure and fitted with satisfactory emergency exit locks

The tolerable standard, in section 86 of the Housing (Scotland) Act 1987, is the baseline under it: structurally stable, substantially free from rising or penetrating damp, adequate lighting, ventilation, heating and thermal insulation, wholesome water, a sink, a toilet, a bath or shower and basin with hot and cold water, drainage, a safe electrical installation, cooking facilities, and equipment that detects and warns of fire and of carbon monoxide.

The same section points to the Scottish Government's guidance on electrical safety, alarms and the rest, and mygov.scot turns that into the checklist most landlords work from:

  • Electrics: a safe installation with an RCD, and a safety inspection by a registered electrician at least every 5 years
  • Gas: installed and maintained by a Gas Safe registered engineer and checked every year
  • Alarms: interlinked smoke alarms in the living room and every hallway and landing, a heat alarm in the kitchen, and a carbon monoxide detector in any space with a carbon-fuelled appliance
  • Legionella: the property assessed for legionella risk

When it applies: the start and every day after

The duty has two halves (section 14(1)): the home must meet the standard at the start of the tenancy, and at all times during it.

At the start. Section 19 says you must inspect the house before the tenancy starts to find any work needed, and tell the tenant about it. A dated inspection with photos is the evidence that you did.

During the tenancy. The duty bites once the tenant tells you, or you otherwise become aware, that work is needed, and you comply only if the work is finished within a reasonable time of that point (section 14(3) and (4)). You also make good any damage the work itself causes (section 14(2)).

There are limits (section 16). The standard does not make you repair damage the tenant is liable for through not using the home properly, rebuild after fire, storm, flood or another inevitable accident, or repair things the tenant is entitled to remove. And you are not in breach where you lacked the rights you needed, such as access, despite taking reasonable steps to get them; for work to shared parts of a building, the lack of a majority of owners' consent counts.

The standard covers almost every private let: section 12 applies it to any tenancy of a house let for human habitation, with exceptions for social tenancies, some agricultural and crofting lets, and holiday lets that are not short-term lets.

Damp and mould since 6 October 2026: Awaab's law in Scotland

The Investigation and Commencement of Repair (Scotland) Regulations 2026 added damp and mould to the standard and put timescales into section 14 of the 2006 Act, from 6 October 2026. The Scottish Government's guidance says private landlords must have regard to it.

StepDeadlineThe law
A competent person investigatesCompleted within 10 working days, counted from the day after you are told or otherwise become awares.14(5) and (6)
You give the tenant a written summary of the resultsWithin 3 working days, counted from the day after the investigation is completeds.14(7)
You start any work needed to make the home substantially free from damp and mouldWithin 5 working days, counted from the day after the investigation is completeds.14(8)
You finish the workWithin a reasonable times.14(4); guidance para 6.4
Something outside your control stops you investigating or starting on timeTell the tenant you cannot, why, and when you will; meanwhile take reasonable steps to reduce the damp or moulds.14(9)

A working day here is any day except a Saturday, a Sunday or a bank holiday in Scotland (section 14(11)). Over the festive season that matters: on GOV.UK's list, 25 and 28 December 2026 and 1 and 4 January 2027 are bank holidays in Scotland, so a report on Monday 21 December 2026 gives until Friday 8 January 2027 to complete the investigation.

What the guidance adds, in brief:

  • The competent person is someone you reasonably consider has the skills and experience to judge the damp and the work it needs. No particular qualification is required, and the investigation should be in person unless another method is justified.
  • The written summary names who investigated, gives a brief account of what they found, confirms whether the home is substantially free from damp and mould, lists any work done on the visit, and, where work is needed, says what and a target date to start. It can go by email, by post or by hand, and the 3 working days run to when you issue it.
  • Starting the work can be immediate treatment or temporary work, but the guidance says a mould wash alone is unlikely to be a suitable repair if the cause is left in place.
  • The compensation of £15 plus £3 a working day that you may read about belongs to the Right to Repair scheme for social tenants. A private tenant's route is the Tribunal, which must now have regard to whether you kept to these duties when it decides whether you met the standard (s.24(1A)).

A worked example. A tenant emails photos of mould on Monday 8 February 2027. The investigation must be complete by Monday 22 February. It is done on Wednesday 17 February and finds a failed extractor fan and mould on the bathroom ceiling. The written summary must be issued by Monday 22 February and the work started by Wednesday 24 February. No bank holiday in Scotland falls in those weeks.

When a tenant goes to the Tribunal

The enforcer is the First-tier Tribunal for Scotland (Housing and Property Chamber). The steps:

  1. 1The tenant tells you first. No application can be made until the landlord has been notified of the work (section 22(3)). The Chamber's guidance says the notice must set out the specific work, and a general statement is not enough.
  2. 2The tenant applies, on the Chamber's repairs application form. The council can apply too, as a third party (section 22(1A)). Applying is free.
  3. 3The Tribunal usually inspects the home before the hearing, and the parties get at least 14 days' notice of the hearing, usually 28.
  4. 4If it finds you failed the standard, it must make a Repairing Standard Enforcement Order (s.24(2)) setting out the work and a period to do it, which cannot be less than 21 days.
  5. 5It can extend the period where satisfactory progress has been made, or on your written undertaking to finish by a later date it accepts (section 25).
  6. 6If the order is not met, the Tribunal tells the council and decides whether to make a rent relief order (section 26).
What it costs youThe law
A rent relief order cutting the rent by up to 90%, for as long as it lasts; the Chamber says it cannot be backdated, and the rent it relieves is not owed later even when it is revoked2006 Act s.27
A fine of up to £1,000 (level 3) for failing to comply with an order without reasonable excuses.28(1) and (7)
The same fine for letting the home to anyone new while an order has effect, unless the Tribunal consentss.28(5) to (7)
The order stays on the property's title until it is revoked, so it binds a buyer tooHousing and Property Chamber repairs FAQ
An order is material the council weighs in the fit and proper person test for registration2004 Act s.85(6)

One more point from the Chamber's guidance: a tenant's application is treated as withdrawn when the tenancy lawfully ends, but one brought by the council carries on.

The repair log the Tribunal will want

Every question the Tribunal asks has a date for its answer: when you were told, when the investigation was done, when the summary went out, when the work started and when it finished. The Chamber has to be satisfied you had a reasonable time since being notified, and the damp and mould duties have fixed day counts, so a log written as things happen is worth more than any account written afterwards.

Keep, for each repair:

  • the date and form of the report, with the tenant's photos
  • the date you became aware, if it was not a report (an inspection, a contractor's note)
  • for damp or mould: who investigated and when, the written summary and the date it was issued
  • the dates the work was booked, started and finished, and the contractor's invoice
  • any notice to the tenant that something outside your control held you up, with the reason
  • any refused or missed access, with dates
  • the pre-tenancy inspection, with its photos

Repairs and the record in LetCompliance

LetCompliance's notice and agreement builders are written for England. For a home in Scotland, the repairs side works the same as anywhere in the UK, and the Scottish timescales are yours to diary:

  • Repairs reported with photos. Tenants report through the tenant portal, a private link with no password, and each report arrives with its photos and the date.
  • Your own contractor. Send the job to the contractor you use, and keep the dates and the cost on the record against the property.
  • The written summary on file. Upload it to the property's documents and email it to the tenant from LetCompliance: each send is written to the activity log with its date and time.
  • The damp and mould dates. LetCompliance's repair response windows are guides, and it does not count Scotland's legal damp and mould timescales for you. Put the 10, 3 and 5 working-day dates on the dashboard calendar as reminders of your own, emailed to you that morning.
  • The certificates behind the standard. Gas safety record, electrical report and EPC: the dates are read from each upload for you to confirm, reminders come at 90, 30, 14, 7 and 1 days before each runs out, and the tenant portal shows the tenant the latest of each.
  • The inspection before the tenancy. Done on a phone, room by room with photos.

The rest of a Scottish let in LetCompliance is on the landlord software for Scotland page.

Keep every repair dated from the first photo to the invoice. Single, for one property, is £7.99 a month.

Frequently asked questions

What is the Repairing Standard in Scotland?

The minimum condition a privately let home in Scotland must meet at the start of a tenancy and throughout it (Housing (Scotland) Act 2006, sections 13 and 14): wind and water tight and fit to live in, structure and installations in repair and working order, safe furnishings and appliances, the tolerable standard, substantially free from damp and mould, safe common parts, a food storage and preparation space, and secure tenement doors.

Does Awaab’s law apply to private landlords in Scotland?

Yes, through the Repairing Standard, since 6 October 2026. A competent person must complete an investigation within 10 working days of you being told about damp or mould, the tenant gets a written summary within 3 working days, and any work needed starts within 5 working days (2006 Act, section 14(5) to (9)).

What is a Repairing Standard Enforcement Order?

An order of the First-tier Tribunal for Scotland requiring the landlord to do the work needed to meet the Repairing Standard within a set period of at least 21 days. Ignoring it without reasonable excuse is an offence, and the Tribunal can then cut the rent by up to 90% with a rent relief order.

How long does a landlord in Scotland have to fix damp and mould?

The work must start within 5 working days of the investigation being completed, and private landlords must finish it within a reasonable time. The investigation itself must be completed within 10 working days of the landlord being told or becoming aware.

Can a tenant in Scotland take a landlord to the Tribunal over repairs?

Yes, after telling the landlord what work is needed. The tenant applies to the Housing and Property Chamber, which usually inspects the home, and applying is free.

Sources and scope

All 14 sources

Every source above is a government or regulator’s page the guide cites, linked where it is used. The worked example is illustrative. The guide also links other publishers in its text, where it uses them. This is guidance, not individual legal advice.

Ask an AI about this guide

Opens your assistant with this page as its source.

Share this guide

𝕏

You have read the guide. Now run the let.

Advertise and reference tenants, sign the agreement, collect the rent, log repairs and keep the tax figures ready all year. Certificates, deposits and deadlines are tracked alongside, so nothing expires unnoticed.

Plans from £7.99 a month, with a 3-day trial and no card. Making Tax Digital, recognised by HMRC, comes with every paid plan, not the trial.