Skip to main content
LetCompliance
Letting Agents

Repairs at a letting agency: repair limits, landlord approvals and contractor invoices

Most of the time an agency spends on repairs goes on the loop around the job: can we go ahead, has the landlord answered, where is the invoice. How to set the repair limit, ask for approval in one message, handle the invoice and close the loop with the landlord.

9 min read

Sample account, an agency’s letting pipeline: 6 properties to market and none yet at viewings, applications, holding deposit, agreement or ready to move in; 14 Brackenholt Road, Sheffield for Margaret Holroyd in the Sheffield branch, 19 Quarnby Rise, Leeds for Gail Whitworth and 27 Fennick Grove, Leeds for Priya Ashworth in the Leeds branch, each not advertised yet
Sample account, an agency’s landlord client: Margaret Holroyd, active, 2 properties, full management at 10% of rent
Sample account with made-up details, 18 Oct 2026

See how LetCompliance works for letting agents

Take an agency managing 200 homes with 30 repairs a month. If half of them are above the landlord’s limit, and each of those takes three calls or emails of ten minutes to get an answer, that is seven and a half hours a month spent asking “can we go ahead?”. These are assumptions, not measured figures, so count your own for a month. Then add the hours spent chasing contractors for invoices, and answering landlords who ring to ask what a cost on their statement was for.

The repair itself is the contractor’s work. The loop around it is yours, and it is where the time goes. This guide sets out that loop from start to finish: the limit, the approval, the emergency, the invoice and the statement.

The repair limit, written into the terms

The repair limit, sometimes called the authorisation limit, is the most you may spend on one job without asking the landlord. It belongs in the terms of business, agreed with each landlord, because it is their money and their legal duty. Section 11 of the Landlord and Tenant Act 1985 puts the repairing duty on the landlord, whoever manages the home (legislation.gov.uk).

Write four things down:

  1. 1The figure, per job, and whether it includes VAT.
  2. 2What counts as an emergency, and that emergency work goes ahead within the terms, with the landlord told straight after.
  3. 3When you get more than one quote, if the landlord wants that above a set figure.
  4. 4How the cost is paid: from the rent you hold, and shown on the next statement with the invoice.

If your agency adds a fee to contractor work or receives anything from the contractor, say so in the terms. An agency in England must publish its fees, each with tax included (Consumer Rights Act 2015, section 83), and a landlord who finds an undisclosed charge on an invoice rarely stays.

A limit that suits one landlord does not suit another. A landlord with one flat and a tight budget may want every job above a modest figure asked; a portfolio landlord may want you to get on with anything short of a new boiler. Set it with each one, and look at it again at renewal. The full set of terms is in letting agent terms of business.

Asking the landlord, in one message

Most approval calls take three contacts because the first message is missing something. An approval request that gets an answer first time carries:

  • What is wrong, in the tenant’s words, with their photos.
  • What the contractor proposes, and the quote, with VAT shown.
  • Why it is needed now, or what happens if it waits.
  • Your recommendation, in one sentence.
  • A way to answer in one tap: approve, decline, or ask for a call.
  • When you need the answer, and what you will do if none comes.

The kitchen tap at 4 Elm Road is leaking under the sink; photos attached. Our plumber quotes £145 including VAT to replace the tap. Left, it will damage the cupboard base. We recommend going ahead this week. Please approve, decline or ask us to call by Thursday.

Ask only once the quote is in. A request without a figure brings a call asking for one.

Emergencies do not wait

A gas leak, no heating or hot water in cold weather, a burst pipe or a home that cannot be locked goes ahead within the terms, and the landlord hears about it straight after. Waiting for an answer while the heating is off in January puts the landlord in breach of their duty, and you in the middle of the complaint.

Social landlords in England must deal with an emergency hazard within 24 hours under Awaab’s Law (Hazards in Social Housing Regulations 2025, regulation 5). It does not bind private landlords or their agents, but 24 hours is a fair benchmark to work to. Whatever you do in an emergency, write down why you went ahead, before the invoice arrives. Emergency repairs out of hours covers the first hour.

The contractor’s invoice

The invoice is where the money is, and where the loop most often stalls.

  • One invoice per job, matching the quote, or with the difference explained.
  • The VAT number, if VAT is charged.
  • A photo of the finished work with it.
  • Checked before you pay: against the quote, against what the landlord approved, and against the landlord’s balance. A payment larger than the balance you hold for that landlord is paid with other clients’ money.
  • On the next statement, as its own line with the invoice attached, so the landlord does not have to ask.

Repair costs are an allowable expense for the landlord against the rent; improvements are not (GOV.UK). A clear description on the invoice (replaced the tap, not upgraded the kitchen) saves the landlord’s accountant a question, and saves you the call that follows it.

Closing the loop with the landlord

A repair is finished for the landlord when they know it is done, what it cost and why. Send a short note when the job is complete: what was wrong, who attended and when, the cost and the invoice. The landlord who hears about a repair before it appears on their statement does not ring about the statement.

StepWho does itWhat is kept
Tenant reports, with photosThe tenantThe report, dated
Priority set, contractor sentYour property managerThe priority and the response date
Quote receivedThe contractorThe quote
Above the limit: landlord askedYour property managerThe request and the answer
Work doneThe contractorPhotos and the completion date
Invoice checked and paidYour accountsThe invoice, the payment
Landlord toldYour property managerThe note sent
On the statementYour accountsThe line, with the invoice

Each row has a name and a record. When a landlord questions a cost six months later, the answer is in the file, not in someone’s memory.

Where the loop leaks time

  • No limit on file. Every job becomes a phone call. Agree a figure with every landlord at onboarding.
  • Asking before the quote. The landlord asks “how much?” and the loop starts again.
  • Approvals in someone’s inbox. A colleague cannot see that the landlord said yes. Keep the answer on the repair.
  • Invoices by email to whoever booked the job. They arrive late, or twice. Ask contractors to send them one way, every time.
  • Costs that surprise the landlord. A line on the statement with no note before it brings a call. Tell them when the job is done.

The repair loop in one place. In a LetCompliance agency workspace, you set each landlord client’s Repair limit on their page. Above it, Ask the landlord emails them from your agency with the quote and a link, valid for 14 days, showing the tenant’s description and photos, where they approve, decline or ask for a call. The answer is kept on the repair, on the client’s page under Approvals and in the notifications of whoever asked. Going ahead without approval needs a written reason, kept on the repair and in the audit log, and an urgent safety repair shows a warning that the landlord’s duty does not wait. The contractor quotes and updates the job from a link with no login, and sends the final amount and the invoice from it as one draft cost you confirm before it reaches a statement. Send to landlord on a completed repair tells them what was done, when, by whom and at what cost, with the invoices. Your agency pays contractors from its own bank, as now. Agency plans start at £24 a month. Every agency plan has every agency tool and unlimited seats and branches; only the number of properties and the storage differ.

Frequently asked questions

What is a letting agent’s repair limit?

The most the agent may spend on one repair without asking the landlord, set in the terms of business. Below it the agent can instruct the work and take the cost from the rent; above it the agent asks first, except in an emergency.

What is a sensible repair limit?

There is no standard figure. Set it with each landlord, high enough that routine jobs go ahead without a call and low enough that the landlord is asked about anything they would want a say in. Review it at renewal.

Can a letting agent do an emergency repair without the landlord’s approval?

Usually yes, when the terms of business allow it, and they should. The repairing duty is the landlord’s and does not wait for an answer. The agent should tell the landlord straight after and record why it went ahead. See can my letting agent do repairs without asking me.

What should an approval request to a landlord include?

What is wrong with the tenant’s photos, the quote with VAT, why it is needed now, the agency’s recommendation, a one-tap way to approve, decline or ask for a call, and the date the answer is needed.

Should a letting agent charge a fee on contractor work?

That is the agency’s choice, but any fee or payment from the contractor belongs in the terms of business and the published fee list. An agent in England must publish its fees with tax included.

Sources and scope

Every source above is a government or regulator’s page the guide cites, linked where it is used. This is guidance, not individual legal advice.

Ask an AI about this guide

Opens your assistant with this page as its source.

Share this guide

𝕏

You have read the guide. Now run the book.

Let and manage every landlord’s property from one workspace: adverts and referencing, the signed tenancy, rent and arrears, repairs and inspections, then each landlord’s statement and the client money report from the same records. Certificates, deposits and deadlines are tracked alongside.

Agency plans start at £24 a month, with unlimited branches and seats on every plan, a 14-day agency trial and no card.