Skip to main content
LetCompliance

Landlord glossarySafety

Electrical Safety Standards Regulations 2020

The rules that require a private landlord in England to have a home’s fixed electrical installation inspected and tested by a qualified person at least every 5 years. Under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, each existing tenant gets a copy of the report within 28 days of the inspection, a new tenant gets one before moving in, and the council gets one within 7 days of asking in writing. Remedial work or further investigation the report requires must be done within 28 days, or sooner if the report says, and the landlord then sends confirmation to the tenant and the council within 28 days of the work.

Collect the rent, log every cost and keep the tax figures ready, from £7.99 a month.

Checked against GOV.UK and legislation.gov.ukLast reviewed 16 November 2026How facts are checked

Interval
At least every 5 years
Existing tenant
Copy within 28 days of the inspection
Council
Copy within 7 days of a request in writing
Remedial work
Within 28 days, or sooner if the report says
Penalty
Up to £40,000

Why it matters

What Electrical Safety Standards Regulations 2020 means for a landlord

The inspection covers the fixed installation: the wiring, sockets, light fittings and fuse box. The report is usually an electrical installation condition report, and the landlord keeps a copy until the next inspection is due or done and gives one to the next inspector. A council can impose a financial penalty of up to £40,000 for a breach. The regulations do not require portable appliance testing. Wales requires electrical testing at least every five years under its fitness for human habitation rules, and in Scotland it is part of the Repairing Standard. Related: EICR (Electrical Installation Condition Report), C1, C2, C3 and FI Codes (Electrical Report) and PAT Testing (Portable Appliance Testing).

Common mistakes

Where landlords go wrong

  1. 01Letting the 5-year test date pass between tenancies.
  2. 02Not giving an existing tenant the report within 28 days.
  3. 03Getting the remedial work done but sending no confirmation to the tenant and the council.

What to do

A short checklist

LetCompliance reads the gas safety, EICR and EPC dates from each upload: landlord certificates in one place, with an email before each one expires. See plans and prices

Sources

Checked against these sources on 16 November 2026. A guide to the rules in England, not legal advice: for a dispute or a possession claim, speak to a solicitor.