Why it matters
What C1, C2, C3 and FI Codes (Electrical Report) means for a landlord
A report with any C1, C2 or FI is unsatisfactory, and the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 then require the work within 28 days of the inspection, or the shorter period the report gives, followed by confirmation from a qualified person that the standards are met. A council can impose a penalty of up to £40,000 for a breach of the electrical safety duties. Wales requires electrical testing at least every five years under its fitness for human habitation rules, and in Scotland it is part of the Repairing Standard. Related: EICR (Electrical Installation Condition Report), Fitness for Human Habitation and Civil Penalty Notice.
Common mistakes
Where landlords go wrong
- 01Treating a C3 as work that must be done before the report is satisfactory.
- 02Getting the work done but not sending the confirmation to the tenant and the council.
- 03Counting the 28 days from the day the report arrived, not the day of the inspection.
What to do
A short checklist
- Book remedial work as soon as a report shows C1, C2 or FI.
- Send the confirmation and the report to the tenant and the council within 28 days of the work.
- Track the next test date with the certificate renewal calculator.
LetCompliance reads the gas safety, EICR and EPC dates from each upload: landlord certificates in one place, with an email before each one expires. See plans and prices
Sources
- legislation.gov.uk: Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, regulation 3
- GOV.UK: Electrical safety standards in the private and social rented sectors, guidance
Checked against these sources on 16 November 2026. A guide to the rules in England, not legal advice: for a dispute or a possession claim, speak to a solicitor.